JAFS has been responsible for the automation of the floor heating / cooling as well as the blowing in the hall for the company Bayer. A two-system GTC upgrade and feedback from the AHU and 11 fan coils has been implemented from a ModBus RTU network.
The set is thus programmed in the existing CPU at the CTA. The connection is made in a second dedicated cabinet. The information is wired on remote input outputs and the management display has been installed on the front of the same cabinet.