Automatisation Bayer

logo_bayer

JAFS has been responsible for the automation of the floor heating / cooling as well as the blowing in the hall for the company Bayer. A two-system GTC upgrade and feedback from the AHU and 11 fan coils has been implemented from a ModBus RTU network.

The set is thus programmed in the existing CPU at the CTA. The connection is made in a second dedicated cabinet. The information is wired on remote input outputs and the management display has been installed on the front of the same cabinet.

Share

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
en_US