Jafs intervened on the IT-CE center (computer and technology Caisse d'Epargne) for the separation of the GTC and the hydraulic cutting of a building divided in two.
A replacement of the electrical terminal regulation in 4-tube hydraulic batteries was carried out (about 130 terminal regulations).